BTC $71,807
2026 Bull Run Is Building Start trading with 5% OFF all fees
Sign Up Now
BTC $71,807
Bull Run 2026 | 5% Off Fees Open your Binance account today
Sign Up

FortiSIEM Critical Path Traversal Flaw Now Has PoC Exploit

Critical Fortinet FortiSIEM flaw enables unauthenticated RCE via path traversal and null-byte injection.

  • Critical path traversal vulnerability CVE-2026-106173 in Fortinet FortiSIEM carries a CVSS score of 9.4 and can be exploited remotely without authentication.
  • Horizon3.ai has released a proof-of-concept exploit that combines directory traversal and null-byte injection to achieve arbitrary file write and remote code execution.
  • Patches are available in FortiSIEM version 7.5.1; version 7.6 is not affected.

Cybersecurity researchers at Horizon3.ai have released a proof-of-concept exploit for a critical flaw in Fortinet FortiSIEM, designated CVE-2026-106173 with a CVSS score of 9.4. The vulnerability enables an unauthenticated attacker to execute unauthorized code via specially crafted packets targeting the gRPC service on TCP port 27918.

- Advertisement -

Patches were issued last week for FortiSIEM version 7.5.0, which must be upgraded to 7.5.1 or above, while version 7.6 is not affected. According to Horizon3.ai, the gRPC QueryResultReq handler processes untrusted metadata without proper path validation, allowing an attacker to embed path traversal sequences and NUL-byte injection within gRPC’s HTTP/2 and HPACK encoding layers.

The problem originates in the SendQueryResult() function, which passes a user-supplied “query-id” parameter without sufficient validation. By including directory traversal sequences like “../”, an attacker can escape the intended directory, though the program appends a fixed file name such as “result--0-0-.dat”.

A second weakness enables null-byte injection into the same parameter: embedding “\0” causes the operating system to treat it as a string terminator, discarding the appended suffix. An attacker can craft a “query-id” value like “../../../../../opt/charting/redishb.sh\0…” to overwrite a shell script that performs health checks on Redis and runs every 60 seconds via a cron job.

“The write lands on the exact path that preceded the null byte,” said Zach Hanley, Chief Attack Engineer at Horizon3.ai. “Pointed at an existing file, this overwrites it in place, keeping the original owner and permissions; a second variant uses two requests to create a brand-new file with an exact name.”

- Advertisement -

✅ Follow BITNEWSBOT on Telegram, Facebook, LinkedIn, X.com, and Google News for instant updates.

Previous Articles:

- Advertisement -
Ad
Altseason Is Loading. Don't watch from the sidelines.
SOL $90.51
DOGE $0.0963
LINK $9.02
SUI $1.00
5% off fees when you sign up
Start Trading
Ad
Pay Less on Every Trade. For Life.
$10K/mo volume Save $60/yr
$50K/mo volume Save $300/yr
$100K/mo volume Save $600/yr
5% off all trading fees when you sign up
Claim Your Discount

Latest News

ImmunityBio founder touts sepsis trials, NantX after Binance theft

Patrick Soon-Shiong renewed his “NantX coming soon” teaser after a $6.3 billion Binance theft,...

Crypto.com Shuts Hong Kong App, Eyes Institutional Exchange

crypto.com will shut down its consumer app in Hong Kong on Feb. 1, 2027,...

Kim Yo Jong denies North Korea behind Binance hack, hints US

Kim Yo Jong denied North Korea's involvement in the $6.3 billion Binance hack and...

Strive buys 124 BTC, fourth among public companies

Strive acquired 124 Bitcoin for roughly $10 million between Oct. 24 and Oct. 30,...

Claude finds 9.8 zero-click Linux root bug

Claude discovered a zero-click Linux vulnerability (CVE-2026-98432) rated 9.8 out of 10, described as...

Must Read

Top 8 Books Every Beginner Should Read About Cryptocurrency

Cryptocurrency and blockchain technology are filled with technical terms that beginners find challenging to understand. One of the best ways to learn about cryptocurrency...
Ad
Altseason Is Loading. These 4 coins are trending right now.
SOL $92.12
DOGE $0.0950
LINK $9.02
SUI $1.02
5% off spot fees when you sign up
Start Trading